     During the summer of 2018, the Gampel Pavillion at the Univerisity of Connecticut underwent a project that affected the underground steam piping to the building. As a result, the contractors running this project reached out to us for a temporary boiler while the project was completed. The boiler ran low-pressure steam to the building for three months while the building was under construction. 

 

     This is a common application for our temporary rental boilers during new construction. Whenever a buildings underground hot water or steam pipes are being replaced, a temporary boiler is a perfect solution to maintaining the facilities needs. 